- 2006, South Johor Economic Region-Regional Environmental Assessment Volume I,
- 2007, Management Plan for the Preservation of Sg. Melayu Mangrove Riparian Buffer
- 2006, Proposed Waterfront Precint Development (Phase 1) Environmental Impact Assessment,
- 2007, Proposed Waterfront Precint Development (Phase 2) Environmental Impact Assessment,
- 2006-2007, Proposed Nusajaya Waterfront Precint (Phase 1) Development – Environmental Management Plan (EMP)
- 2007, Proposed Nusajaya Waterfront Precint (Phase 2) Development – Environmental Management Plan (EMP)
- 2007-2008, Environmental Monitoring and Auditing for Waterfront (Phase 1) Precinct Development
- 2007, Environmental Monitoring and Auditing for Waterfront (Phase2) Precinct Development, 2007
- 2006, Mapping Environmentally Sensitive Area (ESA) for Kemesah Heights (Kemesah Phase 1)
- 2007, Mapping Land Parcels Location of Private Land in Kemesah Using Quickbird Image (Kemesah Phase 2),
- 2006, DEIA Study for Proposed Kota Air Mixed Development at Pasir Putih, Pasir Gudang, Johor
- 2007, EMP for the Proposed Phase 1 Arapesona Development
- 2007-2008, Proposed Phase 1 Arapesona Development – Environmental Monitoring and Auditing Monitoring Report ( During Construction) No.1 and No.2
- Cameron Highlands and Batang Padang Hydroelectric Scheme Life Extension Project : Desilting of Ringlet Reservior (Contract No : 247/2005)- Environmental Management Plan – Audit
- 2006-2007, Macro EIA Study of the Proposed Nusajaya Township Development
- 2007, EIA Study of the Proposed Penang Second Crossing
- 2007-2008, Proposed Resort Development on PTD 1338,PTD 1339 and PTD 1340 Mukim Tanjung Surat, Daerah Kota Tinggi, Johor – EIA
- Detailed Environment Impact Assessment (DEIA) and Hydraulic Study for the Proposed Seri Tanjung Pinang, Phase 2 Development, Tg. Tokong, Penang
- Detailed Environmental Impact Assessment (DEIA) Study for the Land Reclamation Project Detail Study at Melaka Refinery,
- 2008, EIA for Residental North Puteri Harbour Malaysia
- Study on Noise & Vibration in South Johor due to Singapore Military Activities
- 2008-2010, Projek Lebuhraya Pantai Timur II (Pakej 2) between CH 15100 to CH 26100 – Environmental Audit Report
- 2008-2010, Projek Lebuhraya Pantai Timur II (Pakej 3) between CH 26100 to CH 40038 – Environmental Audit Report
- 2009, Northern Estuary at Nusajaya.