Homepage Projek Perundingan

Projek Perundingan

  1. 2006, South Johor Economic Region-Regional Environmental Assessment Volume I,
  2. 2007, Management Plan for the Preservation of Sg. Melayu Mangrove Riparian Buffer
  3. 2006, Proposed Waterfront Precint Development (Phase 1) Environmental Impact Assessment,
  4. 2007, Proposed Waterfront Precint Development (Phase 2) Environmental Impact Assessment,
  5. 2006-2007, Proposed Nusajaya Waterfront Precint (Phase 1) Development – Environmental Management Plan (EMP)
  6. 2007, Proposed Nusajaya Waterfront Precint (Phase 2) Development –  Environmental Management Plan (EMP)
  7. 2007-2008, Environmental Monitoring and Auditing for Waterfront (Phase 1) Precinct Development
  8. 2007, Environmental Monitoring and Auditing for Waterfront (Phase2) Precinct Development, 2007
  9. 2006, Mapping Environmentally Sensitive Area (ESA) for Kemesah Heights (Kemesah Phase 1)
  10. 2007, Mapping Land Parcels Location of Private Land in Kemesah Using Quickbird Image (Kemesah Phase 2),
  11. 2006, DEIA Study for Proposed Kota Air Mixed Development at Pasir Putih, Pasir Gudang, Johor
  12. 2007, EMP for the Proposed Phase 1 Arapesona Development
  13. 2007-2008, Proposed Phase 1 Arapesona Development – Environmental Monitoring and Auditing Monitoring Report ( During Construction) No.1 and No.2
  14. Cameron Highlands and Batang Padang Hydroelectric Scheme Life Extension Project : Desilting of Ringlet Reservior (Contract No : 247/2005)- Environmental Management Plan – Audit
  15. 2006-2007, Macro EIA Study of the Proposed Nusajaya Township Development
  16. 2007, EIA Study of the Proposed Penang Second Crossing
  17. 2007-2008, Proposed Resort Development on PTD 1338,PTD 1339 and PTD 1340 Mukim Tanjung Surat, Daerah Kota Tinggi, Johor – EIA
  18. Detailed Environment Impact Assessment (DEIA) and Hydraulic Study for the Proposed Seri Tanjung Pinang, Phase 2  Development, Tg. Tokong, Penang
  19. Detailed Environmental Impact Assessment (DEIA) Study for the Land Reclamation Project Detail Study at Melaka Refinery,
  20. 2008, EIA for Residental North Puteri Harbour Malaysia
  21. Study on Noise & Vibration in South Johor due to Singapore Military Activities
  22. 2008-2010, Projek Lebuhraya Pantai Timur II (Pakej 2) between CH 15100 to CH 26100 – Environmental Audit Report
  23. 2008-2010, Projek Lebuhraya Pantai Timur II (Pakej 3) between CH 26100 to CH 40038 – Environmental Audit Report
  24. 2009, Northern Estuary at Nusajaya.